Biofeed Standard Installation Requirements

IMPORTANT! Incorrect installation will void your warranty

The Biofeed standard food waste pulper is made almost entirely of stainless steel and can be installed indoors or outdoors. Outdoor placement requires freeze protection on the water and drain when needed and a rain cover for the unit (not supplied).

UTILITIES REQUIRED

All pre-installation requirements to be placed within 1m of equipment and outside of machines footprint.

  1. 5 pin plug neutral middle 415V 20A 60Hz 3Ph from a dedicated circuit
  2. Electrical wire from tank to machine
  3. Ethernet or internet connection
  4. 16mm tap cold water line fit with a backflow prevention valve and a mixer with 32 degree temp min 380kpa
  5. All utilities are to be within 1m of the unit OUTSIDE of the unit’s footprint
  6. Installation and connection to utilities to be done by licensed trades people
  7. A representative from Biofeed will start the unit and train personnel

SITE PREPARATION REQUIRMED

Biofeed – Level solid ground 1.5m diameter.

Tank – The site must be firm, level, stable ground. It must be at least 600mm greater in diameter than the tank. The base must be adequately and uniformly supported over its whole area. Do not place the tank on beams with interval spaces. Ensure that the area is free from any sharp objects such as stones or roots. A concrete pad or 100mm deep compacted sand is recommended and must also be 600mm greater in diameter than the tank.

CLEANING INFORMATION

Exterior: Clean with soapy water and shine with stainless steel polish • interior: Water only. No soap, bleaches orcleaners.

Scroll to Top